Friday, January 28, 2011

Updated Rendering

I ran this rendering again last night. The mechanical room is still being designed but its getting more nailed down. I added the glycol feeders and the tempering valve you can see in the back behind the water heater. I changed the pipe materials to copper. Eventually I will save the different pipe types into seperate models so I can add seperate materials to them (cannot currently do this in revit)...

8 comments:

  1. Looks impressive. Keep up with the great posts.
    I'm curious as to your issue with pipe materials... Can you not just create a new "type" for your different pipe materials?

    JB

    ReplyDelete
  2. Great rendering. Question? Have you had a contractor ask you about pipe or duct hanger yet?

    ReplyDelete
  3. I'm learning more about this. Hope you bring more things related to it. Thanks a lot!Great information.

    ReplyDelete
  4. THANKS FOR SHARING SUCH A AMAZING WORK
    NICE WORK
    MEP F modelling in USA

    ReplyDelete